Glazer Children's Museum



Glazer Children's Museum
    Glazer Children's Museum
    Glazer Children's Museum
    Glazer Children's Museum
    Glazer Children's Museum


With only a 16-month construction and move-in timeframe, the Glazer Children's Museum required exterior cladding that could be installed quickly. In addition, the design team wanted a striking building to serve a demonstration tool, teaching children about sustainability and protecting the environment.

Architect: Forum Architecture
General Contractor: Delotto & Sons
Installer: FG Metals
Location: Tampa, FL
Products: